DETAILED GAS ANALYSIS – Transformer Oil
The collection of Transformer Oil samples according to the following procedure…
For D.G.A. to be meanful samples should be collected according to EN60567 or IEC567, however, the following briefly details the procedure which should be adopted.
…The 3 way stop cock should be fitted to the syringe and a oil proof plastic or rubber tube is fitted to the inlet port of the stop cock through which the oil may be sucked into the syringe.
…With the stop cock to the rubber tube open and the 3rd port closed, fill the syringe with from the transformer sampling point.
…Without removing the tube from the oil, change the setting on stop cock so that the inlet from the tube is closed and the outlet via 3rd port is open so that the contents of the syringe may be emptied to waste. Repeat this procedure once more to ensure syringe and tube are flushed with oil and air is expelled ensuring that the tube remains in the oil.
…After flushing, fill the syringe with 50ml of oil and close the stop cock to ensure that only oil and entrapped gasses in the oil remain in the syringe. The rubber tube can then be removed and fitted to the next syringe and complete procedure repeated for each sample.
Sample points and Labelling…
Samples should be taken from both the top of the transformer main tank and from the bottom of the main tank. (i.e…2 samples from each transformer).
If previous DGA details are available this should be supplied with each sample (ensure identification) in order that comparison can be made with the present findings. By making such comparisons a meaningful interpretation can be made and possible problems identified more positively.
Samples must be clearly labelled for identification and should state location of sample point and all relevant detail.
**Please note that DGA can not be carried out on diverter oil samples and that same would be worthless as high gas content is expected and is normal here due to arcing etc. during switching. Further more such oil would damage the test equipment.**
Packing for transport by air must be suitable in order to protect syringes from shock and breakage during transport. Movement by the syringe plunger will allow for expansion during flight.
…Samples must then be sent, full carriage prepaid, to…..
FILTERALL LIMITED
**FILTERALL LABORATORY ADDRESS WILL BE ADVISED AT TIME OF ORDER
**Mark ADGA ANALYSIS SAMPLES@ FILTERALL ref Exxxxxx**
Please advise Filterall by telefax when samples are despatched and give all carrier details in order that same may be expedited.
Transformer Oil limitation dryout
Modern oil purification systems such as the FILTERALL Transformer Oil [...]
Transformer Connection for Online Purification With E6000-BC
It is suggested the transformer be de-energized for a short [...]
FILTERALL and SD Myers deliver Transformer training to Shell UK
Everybody working in the power sector understands how expensive and [...]
FILTERALL QUALITY GETS THE ISOQAR SEAL OF APPROVAL
It is obvious from the the ‘blue chip’ client list, [...]
The Oil Purification Plant that keeps on running and running
Back in 1985 the Central Electricity Board of Mauritius purchased [...]
FILTERALL DELIVERS PRODUCT TO ITS 100th DIFFERENT COUNTRY !
In these times of globalisation, it comes as no surprise [...]